公司新闻
装载机的安装调试与组成的注意事项
来源:http://www.ycgjglcl.com/ 日期:2023-02-24
装载机安装
Loader installation
济南装载机租赁厂家提醒您,装载机的安装须有专门的人员进行安装。按照整机的结构特征根据图纸的要求进行安装。按照底盘架——输送架——调节架——挖掘部分——液压系统——电气系统的安装顺序。
Jinan loader rental manufacturer reminds you that the loader installation must be carried out by special personnel. Install according to the structural characteristics of the complete machine and the requirements of the drawings. According to the installation sequence of chassis frame - conveyor frame - regulating frame - excavation part - hydraulic system - electrical system.
装载机调试
Loader commissioning
1、试运行前的准备工作:确认电路已接通,电缆松紧适度;确认油箱已按规定加注液压油;对连接部位的销轴、油缸部位结合面相互摩擦的地方涂上润滑脂。
1. Preparations before commissioning: confirm that the circuit is connected and the cable is moderately tight; Confirm that the oil tank has been filled with hydraulic oil as required; Apply lubricating grease on the joint surface of the pin shaft and the oil cylinder at the connecting part where they rub against each other.
2、试运行:首先启动行走系统察看机器行驶是否正常,转向系统是否灵活,再启动输送系统运转是否正常。其次启动挖掘部分,察看伸展臂是否正常,伸展臂转动是否灵活。
2. Test run: first start the traveling system to check whether the machine is running normally and whether the steering system is flexible, and then start the conveying system to check whether it is running normally. Secondly, start the excavation part and check whether the extension arm is normal and flexible.
组装的注意事项
Precautions for assembly
1、组装各连接螺栓时,应检查防松垫圈是否齐全以及松紧程度是否符合要求。
1. When assembling each connecting bolt, check whether the lock washer is complete and whether the tightness meets the requirements.
2、液压系统的接头部分必须擦拭干净,不得有灰尘和杂质进入。同时检查密封圈是否齐全或损坏,所有管路应按原始位置理顺固定好。
2. The joints of the hydraulic system must be wiped clean and free of dust and impurities. At the same time, check whether the sealing ring is complete or damaged, and all pipelines shall be straightened and fixed according to the original position.
3、整机安装完毕后应仔细检查各部件管件、辅件等,是否安装正确稳妥。
3. After the installation of the complete machine, carefully check the pipe fittings and accessories of each component to see if they are installed correctly and reliably.
4、电气部件安装要有专人担任。进入接线盒的电缆直径要与橡皮垫的孔径相符,压紧接线头应保证橡皮垫与电缆间和橡皮垫与接线盒无间隙,否则将失去隔爆性能。
4. The electrical components shall be installed by special personnel. The diameter of the cable entering the junction box shall be consistent with the hole diameter of the rubber pad, and the compression of the connector shall ensure that there is no gap between the rubber pad and the cable and between the rubber pad and the junction box, otherwise the flameproof performance will be lost.
此外为了安全着想,在作业或调试时,在铲斗所及范围内严禁站人,禁止接触转动部位。出现故障或有异常杂音,应立即停车检查,并切断总电源。更多事项就来我们网站http://www.ycgjglcl.com咨询!
In addition, for the sake of safety, during operation or commissioning, it is forbidden to stand within the reach of the bucket and touch the rotating parts. In case of failure or abnormal noise, stop the machine immediately for inspection and cut off the main power supply. Come to our website for more matters http://www.ycgjglcl.com consulting service