公司新闻
导致摊铺机作业老是走偏的四个因素
来源:http://www.ycgjglcl.com/ 日期:2023-01-28
摊铺机是现代路面工程常见的施工设备之一,不过有些机友不明白自己的摊铺机在施工中老是走偏,今天济南摊铺机出租厂家给大家简要介绍一下,导致摊铺机作业,老是走偏的四个因素。
The paver is one of the common construction equipment in modern pavement engineering. However, some users do not understand that their pavers always deviate during construction. Today, the rental manufacturer of Jinan paver briefly introduces the four factors that cause the paver to operate and always deviate.
摊铺机操作技术因素
Technical factors of paver operation
人们常说欲善其功必先利其,但是再好的工具也不是可以自己就能把工作做完,就像千里马也需要懂他还能够很好驾驭它的骑手一样,再好的摊铺机,如果操作手没有相关经验,作业前不能根据现场需要把各个部件调整到位,在实际施工中临时慌忙调整很难避免跑偏等问题的出现。
It is often said that if you want to do good work, you must make good use of it, but the best tool can't finish the work by itself. Just like the rider who also needs to understand and can control it well, the best paver, if the operator has no relevant experience, can't adjust all parts in place according to the needs of the site before operation, and it is difficult to avoid problems such as deviation in the actual construction.
摊铺机电磁阀接线问题
Wiring problem of paver solenoid valve
熟悉摊铺机的朋友都知道,摊铺机行走很重要,摊铺机使用时间一长,特别是二手摊铺机,电磁阀接线很容易出现松动,如果一边电磁阀接线出现问题和容易导致这一边工作泵不能正常供电,这样在摊铺机施工作业中一边正常另一边不能同步很容易导致在施工中出现走偏。
Friends who are familiar with the paver know that the paver is very important to walk. As the paver has been used for a long time, especially for second-hand pavers, the solenoid valve wiring is easy to become loose. If there is a problem with the solenoid valve wiring on one side and it is easy to cause the working pump on the other side to be unable to supply power normally, this is easy to cause the deviation in the construction when one side is normal and the other side is not synchronized during the construction of the paver.
摊铺机行走马达缺油或出现异常磨损
The traveling motor of the paver is lack of oil or has abnormal wear
摊铺机行走马达就像我们的双脚,如果因为缺油导致关节病,或因为长时间的使用导致行走马达工作面或端面出现异常的严重磨损,就容易出现因马达效率降低,而造成有问题的一边动力输出异常,从而产生施工作业中的跑偏。
The walking motor of the paver is like our feet. If the joint disease is caused by lack of oil, or the working face or end face of the walking motor is abnormally worn due to long time use, it is easy to cause abnormal power output of the problematic side due to the reduced efficiency of the motor, resulting in deviation during construction.
施工现场管理混乱
The construction site management is chaotic
糟糕的施工现场可能各有不同但是,科学规范的施工作业很多摊铺机手都一定见过,现实施工中很多摊铺机手很难有这样理想的施工条件,天气、现场车辆、路基作业面、现场人员和车辆配合和避让都会导致施工中摊铺机不能按照我们理想的路线前进而出现走偏。
Bad construction sites may be different. However, many pavers must have seen scientific and standardized construction operations. In reality, many pavers are hard to have such ideal construction conditions. Weather, on-site vehicles, subgrade working surface, on-site personnel and vehicle cooperation and avoidance will lead to pavers failing to move forward according to our ideal route and deviation during construction.
如果要求摊铺机手每次都不出现一点走偏不是很现实,但是钢甲天下二手工程机械以为,在施工前我们只要做好各项准备,在施工中多加注意施工现场的现场的指挥和配合就可以大大减少摊铺机施工中的走偏。更多相关内容就来我们网站http://www.ycgjglcl.com咨询吧!
It is not very realistic to require that the paver hands do not deviate a little every time, but the second-hand construction machinery of Steel Jiatianxia believes that as long as we make all preparations before construction and pay more attention to the on-site command and cooperation during construction, we can greatly reduce the deviation of the paver during construction. Come to our website for more relevant content http://www.ycgjglcl.com Ask!