公司新闻
补沥青料的使用特点有哪些?
来源:http://www.ycgjglcl.com/ 日期:2023-09-23
适应温度范围广,即使在高寒地区、冬季也可进行正常修补。
It can adapt to a wide temperature range and can be repaired normally even in high cold areas and winter.
通常特别适合于微小坑槽等小面积病害的日常修补,即烂即补,不受大型机械设备限制、仅需切边、碾压等小型机具,及时扼制路面病害,可促进路面预防性养护。
It is usually particularly suitable for daily repair of small areas of diseases such as small pits and grooves, which can be repaired immediately after decay. It is not limited by large mechanical equipment and only requires small tools such as edge cutting and rolling. Timely control of road surface diseases can promote preventive maintenance of the road surface.
养护操作工序简便易行,修补时无需加热或搅拌,随取随用,不浪费材料。修补过后马上就能开放交通,大大缓解高等级公路因道路修补施工而造成的交通压力。
The maintenance operation process is simple and easy to operate, and there is no need for heating or stirring during repair. It can be taken and used as needed without wasting materials. After the repair, traffic can be opened immediately, greatly alleviating the traffic pressure caused by road repair construction on high-grade highways.
嘉格冷补沥青料具有较强的粘结性能,与基层和原路面结合良好,补后不会产生松散、脱落、龟裂等病害。养护质量和修补效果均能达到养护标准要求、质量稳定。
Jiage cold patching asphalt material has strong bonding performance, and it combines well with the base and original road surface. After patching, it will not produce diseases such as looseness, peeling, and cracking. The maintenance quality and repair effect can meet the maintenance standard requirements, and the quality is stable.
使用嘉格冷补沥青料施工时无烟尘、不含有毒物质,材料不溶于水,不会污染空气、环境和地下水,有利于环境保护。
When using Jiage cold patching asphalt material for construction, it is smoke-free, free of toxic substances, insoluble in water, and does not pollute the air, environment, and groundwater, which is beneficial for environmental protection.
嘉格冷补沥青料采沥青混合拌合站集中规范化生产,材料品质有保障。嘉格补沥青料的基本生产工艺流程:配制冷补沥青并保温设定油石比集料、配料、上料试生产取样检验调整配合比正式生产取样检验合格后包装入库抽样检验出厂。
Jiage cold patching asphalt is produced in a centralized and standardized manner at the asphalt mixing plant, ensuring the quality of the materials. The basic production process of Jiage supplementary asphalt material: prepare cold supplementary asphalt and set the oil stone ratio for insulation. Aggregate, ingredients, and loading are used for trial production, sampling and inspection. The mix ratio is adjusted for formal production, sampling and inspection. After passing the inspection, packaging, warehousing, sampling and inspection are carried out before leaving the factory.