整理的一些搅拌站的多面建站流程

来源:http://www.ycgjglcl.com/ 日期:2022-06-22
随着建  清场场地选好后,用挖掘机清除表面杂物及淤泥,并运至指定场地堆放。场地选择在场地开挖前做好坡顶截水沟,并视土质情况做好防渗工作。场地开挖必须按自上而下开挖,不得乱挖、超挖及欠挖,开挖至场地顶面时应注意预留碾压沉降高度,当遇到石方时,采用破碎锤施工。
After the construction site is selected, the sundries and sludge on the surface shall be removed by excavator and transported to the designated site for stacking. For site selection, the intercepting ditch on the slope top shall be completed before site excavation, and the anti-seepage work shall be done according to the soil conditions. The site excavation must be conducted from top to bottom. Random excavation, over excavation and under excavation are not allowed. When excavating to the top of the site, attention shall be paid to the reserved rolling settlement height. When encountering rock, the crushing hammer shall be used for construction.
开挖至设计标高后,碾压密实平整,达不到承载力要求的采用片石换填。排水搅拌站场地在平整场地和硬化场地时,总体控制向两侧设置排水,设置-3%的纵坡,场地内四周设置40×40排水沟,保证场内排水通畅。
After excavation to the design elevation, it shall be compacted and leveled. If the bearing capacity cannot be reached, it shall be replaced with rubble. When leveling and hardening the site of the drainage mixing plant, the overall control is to set drainage to both sides, with -3% longitudinal slope, and 40 × 40 drainage ditch to ensure smooth drainage in the site.
济南水稳搅拌站
六个料仓在硬化场地时做单外5%的排水坡,使料仓的水直通过场地纵坡排入到排水沟;搅拌站主机排水必须设置沉淀池,以便清洗搅拌机废弃水沉淀后在排入排水沟。场地外设置60×40排水沟。NO.04场地硬化
When the six silos harden the site, they shall be provided with a single 5% drainage slope, so that the water from the silos can be directly discharged into the drainage ditch through the longitudinal slope of the site; The main machine drainage of the mixing plant must be provided with a sedimentation tank so that the waste water from the mixer can be discharged into the drainage ditch after sedimentation. Off site setting 60 × 40 drainage ditch. No.04 site hardening
第一级:1m片石+0.3m水稳层+0.2mC25混凝土;第二、三级:0.3m水稳层+0.2mC25混凝土。NO.05搅拌站、料仓基础搅拌站、料仓基础用桩承式,承台尺寸为5×5×1m,每个承台下设置4根直径1.2m的桩基,桩嵌入中风化岩层不小于4m,采用C30混凝土浇注。
Level I: 1m rubble +0.3m water stable layer +0.2mc25 concrete; Grade II and III: 0.3m water stable layer +0.2mc25 concrete. No.05 mixing plant, silo foundation mixing plant and silo foundation are of pile supported type, and the bearing platform size is 5 × five × 1m. Four pile foundations with a diameter of 1.2m are set under each bearing platform. The pile is embedded into the moderately weathered rock stratum for not less than 4m, and C30 concrete is used for pouring.
料仓料场布置在搅拌站主机的后侧,共分为6个料仓,二个砂仓,四个石料仓,分料仓隔墙采用“37”墙砌筑高度不小于1.8m,并用水泥砂浆抹面,仓内地面设置5%的地面坡度,分料仓隔墙下预留孔洞,避免积水。
The silo yard is arranged at the rear side of the main machine of the mixing plant, which is divided into 6 silos, two sand silos and four stone silos. The partition wall of the silo is constructed with "37" wall with a height of not less than 1.8m and plastered with cement mortar. The ground inside the silo is set with a 5% ground slope. Holes are reserved under the partition wall of the silo to avoid ponding.
各种料仓区域划分清楚,设置材料标示牌,尺寸40*750px,标明材料名称、产地、规格、计量单位、质量状况等。在料仓边上安装水管,以便在砂石料被污染的前提下冲洗。
The areas of various silos shall be clearly divided, and material signboards with a size of 40*750px shall be set to indicate the name, origin, specification, unit of measurement, quality status, etc. of the materials. Water pipes shall be installed at the edge of the silo to wash the sand and stone materials if they are contaminated.
济南水稳搅拌站采取封闭式管理,根据现场实际情况,四周砌砖墙围闭,采用24墙,高2m,每隔6m间距砌筑一个砖柱,砖柱顶部进行带帽。在进出口设置门卫室,并悬挂安全生成及质量方面的标语,并插上彩旗。场内施工设置标识牌。
Jinan water stability mixing plant adopts closed management. According to the actual situation of the site, it is surrounded by 24 brick walls with a height of 2m. A brick column is built every 6m, and the top of the brick column is capped. A guard room shall be set at the entrance and exit, with slogans on safety generation and quality hung and colored flags inserted. Signboards shall be set up for on-site construction.
以上就是今天为大家分享的关于问题的相关内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站http://www.ycgjglcl.com。筑、公路等市场的发展需求,混凝土搅拌站越来越广泛的被应用,以下整理的一些搅拌站的建站流程,希望对大家有所帮助。
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.ycgjglcl.com 。 Due to the development needs of construction, highway and other markets, concrete mixing plants are more and more widely used. The following sorting out the construction process of some mixing plants, hoping to help you.